Stay connected and secure with this Mini Magnetic GPS Tracker, designed for kids, elderly, vehicles, and valuables. Compact and discreet, it provides real-time location tracking via Google Maps, along with audio monitoring and recording features. With a strong magnetic mount, it attaches easily to any metal surface, making it a versatile tool for personal and professional use.
Key Features
➤ Real-time GPS tracking via Google Maps
➤ Strong magnetic mount for easy placement
➤ Compact and discreet design for hidden use
➤ Voice monitoring by dialing SIM directly
➤ Route recording with up to 16GB TF card (not included)
➤ Multi-purpose use for people, cars, bikes, or valuables
Ingredients / Materials
High-quality ABS housing, strong neodymium magnet, electronic GPS chipset
How to Use
➤ Insert a working SIM card into the tracker
➤ Place the device on a metal surface or carry discreetly
➤ Track location via SMS or Google Maps link
➤ Dial the SIM for live audio monitoring
➤ Insert TF card to record routes if needed
Package Includes
➤ 1 × Mini GPS Tracker Device
➤ 1 × USB Charging Cable
➤ 1 × User Manual






